Bella Vista Mica 185mm Stainless Steel Wall Mixer with Straight Spout Rectangle Plate Variant Colour Available
Selected item and quantity only. Accessories excluded. Final freight confirmed at checkout.
Specifications
Features
Features
The Bella Vista Mica 185mm Stainless Steel Wall Mixer with Spout offers a refined fusion of contemporary styling and reliable performance. Featuring a 185mm projection, the integrated spout delivers smooth water flow and a balanced proportion that suits a wide range of basin configurations. Crafted from high-quality stainless steel, it provides excellent durability and corrosion resistance, maintaining its sophisticated appearance over time.
Engineered for wall-mounted installation, this mixer enhances bench space while creating a clean, architectural look in both bathrooms and powder rooms. The streamlined spout design complements modern interiors, while its solid construction ensures dependable everyday use. Available in multiple colour variants, it allows for effortless coordination with your chosen tapware and bathroom accessories. Combining practicality with understated elegance, this wall mixer is a versatile and lasting addition to any contemporary bathroom environment.
Specifications:
-
- Wall Mixer with Spout Rough-In Body included
-
- Colour: Chrome / Matt Black
-
- Material: Stainless Steel
-
- 185mm Spout Supplied As Default
-
- Rectangle Cover Plate
-
- Lead Free
-
- WELS Rating: 4 Star, 6.5L/Min
-
- WELS Registration No.: T41401
-
- WELS Licence Number: 0339
-
- Warranty:
Lifetime parts or replacement product
1 Year parts & labour
Lifetime guarantee on colour
Excludes: Scratches, discolouration due to chemical damage, misuse, incorrect installation, or lack of maintenance
Dimensions
Dimensions
Product Options
Product Options
Color
About Brand
About Brand
Bella Vista is an Australian brand built on precision engineering and rigorous craftsmanship. Designed and developed by in-house engineers in Melbourne, each product is created with a focus on durability and long-term performance. With a commitment to local production and strict quality control, Bella Vista delivers reliable bathroom solutions that are built to last.
Engineered in Australia
Developed by in-house engineers in Melbourne, Bella Vista products are designed with precision and built for long-term reliability.
Built for Lifetime Use
Every product is crafted with durability in mind, ensuring extended lifespan and dependable performance over time.
Rigorous Design Process
Bella Vista follows a meticulous design and production process, continuously refining every detail to achieve the highest standards.
Local Production
With key products designed, warehoused, and manufactured in Melbourne, Bella Vista supports Australian jobs while maintaining strict quality control.
Explore the Bella Vista collection
Shop Bella Vista products →Browse the full Bella Vista range and use filters to find the right product, finish and style.
Shipping
Shipping
Delivery timeframes, order processing, pickup and delivery charges — everything you need to know about getting your order to you.
Last updated 5 November 2026
- Shipping & freight
- Delivery times
- Order processing
- Extra charges
- Missed delivery
- Pickup
- Out of stock
- Need help
01 Shipping & freight
- For most items, shipping is calculated at checkout from your delivery postcode and cart, and the amount shown is the amount you pay.
- Large or bulky items (for example baths and vanities), tiles and flooring delivered outside our free-shipping area require a freight quote. For these orders, the $1 shipping shown at checkout is a placeholder only — it is not the final freight cost.
- After you place the order, our team will contact you with the actual freight cost for your address. We will not dispatch your order until you approve that cost. If you choose not to proceed, you will receive a full refund — no obligation.
- Greater Sydney — ongoing free shipping. We offer standing free standard shipping to Greater Sydney and selected nearby regions on eligible orders. This is a permanent offer, not a limited-time promotion.
- Other areas — occasional free-shipping promotions. From time to time we also run limited-time free-shipping promotions to additional areas. These are shown on site and at checkout for the promotion period only; eligible areas and dates may change, and they cannot be combined with any other offer or discount. MyHomeware reserves the right to make the final decision.
02 Standard delivery timeframes
| Destination | Delivery time after dispatch |
|---|---|
| Metro areas (all states) | 2–7 business days |
| Regional areas (all states) | 7–15 business days |
03 Order processing & delays
- You'll receive an Order Confirmation Email as soon as your order has been successfully placed.
- Please allow 0–3 business days for order processing. In most cases, in-stock orders are dispatched within the first 24 hours.
- Once your order has been dispatched, we'll email you the tracking information.
Some delays may occur due to circumstances outside our control:
- Public holidays, peak trading periods and major sale events may extend processing and delivery times. During Christmas and major sale periods, please allow extra time.
- Exceptionally high order volumes may occasionally extend processing times.
04 Additional delivery charges
Additional charges beyond the standard delivery fee may apply where:
- Stair or lift access is required — for example, where the delivery point is not directly accessible or goods need to be carried up stairs. Additional charges may apply due to the extra labour and time required.
- The delivery location is difficult to access, or two or more people are required to complete the delivery safely.
05 Missed deliveries
- If nobody is available at the delivery address during the agreed delivery window, a redelivery fee may apply.
- Any additional charge will be communicated to you and agreed before a second delivery attempt is arranged.
- Please ensure that you or an authorised person is available at the delivery address during the agreed delivery window.
06 Pickup
- We'll prepare your order as soon as possible and email you a notification with your booking number and collection details once it is ready.
- Please wait until you receive this confirmation email before coming to collect your order.
MyHomeware — North Rocks Showroom & Warehouse
Unit E, 21 Loyalty Road, North Rocks NSW 2151
Warehouse hours: Mon–Fri 9:00am–5:00pm · Sat 10:00am–4:00pm
07 Out-of-stock & backordered items
Stock levels can change quickly, and occasionally an item may show as available but sell out shortly after your order is placed. If this happens, we'll email you and provide the following three options:
- Cancel backordered items We'll remove the unavailable items and dispatch the remaining in-stock items as soon as possible.
- Cancel the whole order Choose immediate store credit or a refund.
- Wait for replenishment We'll hold your order until the backordered items arrive.
Need help? Live Chat is the fastest way to reach us
Due to high call volumes, phone waiting times may be longer than usual. Our Live Chat team is available for extended hours and can usually assist more quickly with delivery timeframes, freight quotes, stock checks and order updates.
- Live Chat — use the chat icon at the bottom right of your screen · Fastest response
- Order & delivery enquiries — support@myhomeware.com.au
- Pre-sales enquiries — sales@myhomeware.com.au
We reply to all enquiries within 1 business day.
Customer Reviews
Explore More Bella Vista
Your No.1 Supplier of Bathroom and Kitchen Products
Sydney's Largest Showroom
Explore hundreds of bathroom and kitchen displays in our expansive Sydney showroom.
See, touch and compare before you buy.Best Selling Deals
Top-rated bathroom & kitchen products at unbeatable prices, updated weekly to bring you Australia’s best value.
Trade-Trusted suppliers
Partnered with Australia’s most trusted tradies. Reliable stock, bulk pricing, and products proven to perform on real job sites.
365-Day Easy Returns & Refunds
(*Terms and Conditions Apply)
Chat with a Live Specialist
Get answers from real people in real time.
Price Beat Policy
Your wallet deserves the best deal.
See it and feel it,
before you buy it.
Walk through full bathroom displays and talk through your renovation with a specialist. Book a one-on-one visit and we'll have everything ready for you.
- Open
- Mon - Fri:9:00am - 5:00pmSaturday:10:00am - 4:00pmSunday:10:00am - 4:00pmBy Appointment Only
- Book ahead
- Free 1-on-1 consult







































































